Ocean freight
On the ocean, delay usually happens before the gate closes, not on the water. If the cut-off, the documents and the container number are not on the same calendar, the vessel sails without the box.
The stuffing plan, the measure and the weight are written before loading. If the measure appears later, the plan changes and there is no space on the quay.
Gefline follows the booking, the load list and the port delivery on one file. The port of arrival and the delivery term are known from the start.
- Booking and cut-off.
- Load list, measure and weight.
- Port delivery.
- Arrival and delivery term.